Pricing

Day rate vs. project rate for video work

Early on, everyone charges a day rate because it feels safe. Later, plenty of production companies discover the day rate was quietly capping their income. Here is when each model wins, and the hybrid that mature studios settle into.

By Cutvey · Published July 8, 2026 · Updated November 2, 2026

On this page
What a day rate really pricesWhat a project rate really pricesThe switching momentThe hybrid that holds upWhichever you choose, protect the marginThe same job, priced both waysWhich to useThe hybrid that holds upMoving a client from days to packages

What a day rate really prices

A day rate prices your time, which makes it perfect for work where time is the product: crewing for another company, second-camera days, straightforward event coverage. It is also the fair choice when scope is genuinely unknowable. The catch: day rates make you cheaper as you get better. The shoot you finish in one day used to take two. Bill by the day and your reward for skill is a smaller invoice.

What a project rate really prices

A project rate prices the outcome: the brand film, the campaign, the launch video. Clients prefer it because budgets need numbers before work begins, and buyers of outcomes do not want to meter your hours. You prefer it because efficiency becomes margin instead of a discount. The risk is scope: a project rate without a written scope is a donation. Deliverables, shoot days, revision rounds, and timeline go in the agreement, and everything beyond them has a price.

The switching moment

The tell is when clients stop asking "what do you charge per day" and start asking "what would this cost." That question is permission to price the outcome. Existing day-rate clients can be moved gently: quote the next project as a package, with the day rate still available for overflow days. Most clients experience the package as an upgrade, because predictability is worth money to them too.

The hybrid that holds up

Project rates for defined productions; day rates for extra shoot days, pickups, and being crewed by peers; retainers for ongoing content clients who need a steady stream. Written down, that is a rate card, and having one changes negotiations: you stop inventing numbers under pressure and start quoting policy.

Whichever you choose, protect the margin

The model matters less than knowing your numbers. A project rate is only better if you actually track what the project cost you: crew, gear, travel, editing hours, the reshoot nobody budgeted. Studios that see real per-project profit adjust their pricing every quarter; studios that do not, discover the problem at tax time. We wrote more on the numbers side in how to price video production.

The same job, priced both ways

Here is a sample job: one shoot day and four edit days. Your numbers will differ.

Day rateProject rate
Shoot day$1,000Included
Edit, 4 days at $800$3,200Included
Quote$4,200$5,500
If the edit takes 6 days$5,800$5,500
If it takes 3 days$3,400$5,500
Who carries the riskThe clientYou
Who gains from your speedThe clientYou

Which to use

SituationUse
Crew work on someone else's jobDay rate
Your own client, clear finalsProject rate
An unclear scopeA paid discovery day, then a project rate
An open-ended retainerA monthly rate with set hours
Live eventsA day rate plus a fixed edit

The hybrid that holds up

Quote a project price, with the assumptions written down: shoot days, rounds and finals. Anything past those goes at a stated day or hourly rate. The client gets one number, and you get a limit.

This price includes one shoot day of up to 10 hours, two rounds of revisions and the finals listed above. Extra shoot days are $1,800 and extra edit time is $120 an hour, quoted before the work starts.

Moving a client from days to packages

Do it at renewal, or on a new job. "Instead of tracking days, I can do this for a set price, so you know the number before we start." Clients often like it, because they can budget for a result.

Overtime on a day rate is its own sum, and the crew day rate calculator does it. The pricing guide shows how to find your rate.

Price it, then send it.

Set up a rate card once and every proposal starts from it. 14 days free, no card needed.